Sometimes construction work is about going the extra mile to make sure your client is happy with the finished result.
With this project, the existing brick wall was damaged due to bad weather and damp conditions. The client wanted a good brick match so we took a picture and sent it to the merchants and we got a match that the client was happy with.
We took the existing wall down and saved the existing blue and coping stones for the pillars. Luckily for us, the foundation was structurally sound so we built on top of it. During the build, we put two courses of blues down for a damp proof course (DPC) and we built the two brick and a half pillars either side before putting the coping stones on top.
After we dry bonded the wall out, we set up both the corner ready to run the main wall in using the Flemish Bond. Once the wall runs in we formed the raking cut either side to create the curve in the wall.
Then we laid the two courses of creasing tiles to form the curve on top of the wall. On top of that, we laid the blue brick on edge.
As with all our projects, we made sure we left the site tidy and usable. For the finishing touch, we cleaned the wall down with brick acid and swilled it down with water to get rid of any excess mortar on the bricks before rehanging the metal gates.